The one principle: the box must reach the finish
A wall keypad is fixed to a back box that holds the wiring. On a plain plastered wall, the box sits flush with the plaster. When a cladding or panel is added on top, the finished face moves outward by anything from a few millimetres for wallpaper to 30–60 mm for stone on adhesive or wood panels on a frame. If the box is not brought forward to the new face, the keypad either sits recessed in a hole or cannot be fixed securely. So for every finish the question is the same: how will the box, or an extension of it, end up flush with the finished surface, with a neat opening around it?
The second rule is to fix keypad positions before the finish is ordered or cut. Stone is often cut off-site from drawings, and panels are made in a workshop. A position changed later means a new slab or panel.
Finish by finish: a comparison
| Finish | Added depth | How the opening is made | Moving a keypad later | Key risk |
|---|---|---|---|---|
| Paint or texture | None | Standard box in plaster | Easy: patch and repaint | None significant |
| Wallpaper | Negligible | Paper trimmed around the box | Easy to moderate: may need a patch of matching paper | Peeling edges if trimmed badly |
| Ceramic or porcelain tiles | 10–20 mm | Cut-out in the tile; box brought to tile face | Hard: a new tile, matching the batch | Cracked tile at the cut-out |
| Marble, granite, stone veneer | 20–60 mm | Precision cut-out in the slab, often off-site | Very hard: a new slab or a visible patch | Wrong position or size on an expensive slab |
| Wood or MDF panelling, fluted panels | 20–60 mm on a frame | Cut-out in the panel; box mounted to the frame | Moderate: a new panel section | Box not secured; heat or wiring trapped in the cavity |
| Upholstered or fabric panels | 25–50 mm | Cut-out with a firm surround | Moderate: re-covering a panel | Fabric fraying or bunching around the plate |
| Glass or back-painted glass | 6–12 mm plus fixing | Hole cut by the glass fabricator before toughening | Very hard: a new glass panel | Toughened glass cannot be cut on site |
Stone, marble and tiles
- Mark positions on the stone layout drawing, centred on the slab joints or the vein pattern where possible, and approve them before cutting.
- Use a box extension or deeper box so the keypad fixes firmly at the stone face, not to the plaster behind it.
- Cut-outs should be slightly larger than the box but smaller than the keypad plate, so the plate covers the edge cleanly.
- Avoid cut-outs right at a slab edge or a joint, where stone is most likely to chip.
- Leave keypads off until the stone is sealed and polished, and protect the box opening during polishing so slurry does not enter the wiring.
Wood panelling, fluted and upholstered walls
- The box must be fixed to something solid — a frame member or a mounting plate the carpenter provides — not just to the thin panel face.
- Keep the wiring in conduit through the cavity and never let cables rest loose behind panels where nails or screws go.
- On fluted panels, place keypads on a flat band or a plain inset, or align the cut-out with the flutes so the plate does not rock on the ridges.
- On upholstered panels, ask for a firm surround so the keypad plate sits flat and the fabric does not fray around it.
- Make one panel section removable near a keypad cluster where practical, so wiring can be reached later without dismantling the wall.
Glass, wallpaper and paint finishes
Glass needs the most planning of all. Toughened and back-painted glass cannot be cut once it has been toughened, so the fabricator must cut the hole first, from exact measurements taken after the box is fixed. Confirm the box position with a template before the glass is ordered. Wallpaper is the easiest premium finish: fit the box flush, hang the paper, trim it neatly at the opening and let the keypad plate cover the edge. Keep a roll of leftover paper for repairs. Paint and textures are standard; just make sure painters mask keypads or leave them off until the final coat, as covered in what to tell electricians, painters and carpenters.
Who does what, and when
| Stage | Who | What |
|---|---|---|
| Design | Designer and automation installer | Fix keypad positions on the wall elevations and finish drawings |
| First fix | Electrician | Conduit and boxes at the right height and depth for the planned finish |
| Finish fabrication | Stone, glass or carpentry team | Cut-outs made from approved positions, with box extensions or mounting plates |
| Finish installation | Same team | Openings protected; wiring kept clear |
| Second fix | Automation installer | Keypads fitted, levelled and tested after polishing, sealing or painting |
This sequence fits into the overall project timeline described in when to plan home automation during construction.
How Pert delivers it — a designed solution, not a DIY kit
Pert works alongside your interior designer, stone fitter and carpenter so that Stella keypads sit flush and level on whatever wall you choose. We mark positions on the finish drawings, tell the electrician the box depth each finish needs, check cut-outs before they are made, and fit the keypads after the finishing work is complete. The keypads then control your tunable and dimmable lighting, motorised curtains and security devices on one Zigbee network through the Pert gateway, installed and commissioned by our own team. When you compare installers, our guide to the best home automation companies in Hyderabad lists what to ask.
Planning stone, wood or glass walls in a Hyderabad home? We design and install keypads, lighting, curtains, scenes and security, coordinated with your interior team. Request a consultation →
Frequently asked questions
Can I install a smart keypad on a marble or granite wall?
Yes. The keypad position must be fixed on the stone layout before the slab is cut, the cut-out made precisely, and the back box brought forward with an extension or deeper box so the keypad fixes firmly at the stone face. Fit the keypad after the stone is sealed and polished.
How are keypads installed on wood panelling?
The back box is fixed to the panel frame or a mounting plate rather than the thin panel face, wiring runs in conduit through the cavity, and the cut-out is made in the panel at the approved position. On fluted panels, keypads are best placed on a flat band or aligned with the flutes.
Can a switch hole be cut in toughened glass on site?
No. Toughened glass cannot be cut after toughening, so the glass fabricator must cut the opening first from exact measurements taken after the back box is fixed. Confirm the position with a template before the glass is ordered.
What happens if I want to move a keypad after the wall is finished?
On paint or wallpaper it is easy to patch. On tiles, stone or glass it usually means replacing a tile, slab or panel, and on wood or upholstered panels it means a new panel section. That is why keypad positions should be agreed before finishes are ordered.